Dundalk Chamber
Intent: create greater awarness of Drogheda/Dundalk within DBEC corridor
Details: standard meet of m1 corridor
Intent: create greater awarness of Drogheda/Dundalk within DBEC corridor
Details: standard meet of m1 corridor
Intent: The maintenance of the M1 Corridor maximising Dublin Belfast economic corridor
Details: The maintenance of the M1 Corridor maximising Dublin Belfast economic corridor
Intent: Awarness of pressure points on business; vat rates; M1 corridor; Brexit protocol
Details: Budget Breakfast
Intent: Retention of the M1 status as priority region on NDP
Details: NDP 2040; Brexit post Winsor
Intent: The updating of the M1 Corridor, a collaboration between Louth cc and the two chambers
Details: M1 CORRIDOR
Intent: The updating of the M1 Corridor, a collaboration between Louth cc and the two chambers
Details: M1 CORRIDOR
Intent: Close cooperation between Louth CC and Dundalk and Drogheda Chambers.
Details: Louth CC SPC
Intent: Providing details re the progress and challenges associated with the delivery of the NBP Project.
Details: Engagement and information sharing regarding the delivery of broadband infrastructure as part of the National Broadband Plan.
Intent: Confirm if 1 hour parking is correct in this area as it is 2 hours everywhere else
Details: Disabled Parking time in Drogheda-pointed out by carer as a shorter time than all other areas
Intent: The updating of the M1 Corridor, a collaboration between Louth cc and the two chambers
Details: M1 CORRIDOR